Waterfall Model
History of the Waterfall Model
On
the origin of the term “waterfall” is often said that Winston Royce
introduced it in 1970, but Royce saw themselves more in the repeated
approach to software development and even used the term “waterfall”.
Royce described the waterfall model as a method he ventured even an
invitation to failure occurred. In 1970 Royce was that the waterfall
model should be seen as the first draft, he felt that the method has
flaws. He brought a document which examined how the initial concept to a
recurrent method could be developed, this new model in each phase was
between a feedback to the previous stage, as we now see in many current
methods. Royce was just annoying for the initial focus method, the
criticism he had on this method was largely ignored Despite Royces
intentions to the waterfall model into a repeat method (iterative
model), the use of this method is still very popular, but opponents of
the waterfall model see it as a naive and inappropriate method for use
in the real world “.
The waterfall model consists of the following phases:
Definition
study / analysis. Research is being conducted and to brainstorm about
the software to get clear what the purpose of the software. Basic
design. It clearly worked out what happened during the first phase
unearthed. In this phase, the customer put on paper and has been given
to the shape of the program. This phase is set to deliver what it has to
do. Technical design / detail design. Using the basic design can be
thought of an actual program. In this phase determines how the
functionality defined in the basic design will be realized. Now is also a
place subdivision in engineering units such as programs, modules and
functions. Construction / implementation. Here is the source code of
programs written. Testing. It checks whether the software is built right
to the designs. Also at this stage errors that surfaced in earlier
stages made. Integration. The system is ready and tested. It will
however take the company to be put into use. This is done in this
phase. Management and maintenance. In order to ensure that the system
will continue to do maintenance to be performed. The waterfall model
consists of several stages. Each phase has its own level also determines
the order. The highest level is performed first and then the lower
stages. This is equal to the natural functioning of a waterfall and
hence the name. Above clearly shows that the various phases from top to
bottom.
Pro’s and Con’s
Advantages
If
in the beginning of the project failures are detected, it takes less
effort (and therefore time and money) for this error. In the waterfall
model phases to be properly sealed first before proceeding to the next
stage. It is believed that the phases are correct before proceeding to
the next phase. In the waterfall model lay the emphasis on
documentation. In the newer software development methodologies makes it
less documentation. This means that when new people in the project, and
people leave it is difficult to transfer knowledge. This disadvantage is
not the traditional waterfall model. It is a straightforward method.
The way of working ensures that there are specific phases. This tells
you what stage it is. One can use this method of milestones. Milestones
can be used to monitor the progress of the project to estimate. The
waterfall model is well known. Many people have experienced, so there
might be easy to work. When frequent portions of the software product to
be delivered this gives the customer confidence, but also the software
development team.
Disadvantages
There
are some disadvantages of this way to develop software. Many software
projects are dependent on external factors. The client is a very
important external factor. Often the requirements over the course of the
project change, because the client wants something different. It is a
disadvantage that the waterfall model assumes that the requirements will
not change during the project. When a requirement changes in the
construction phase, a substantial number of phases made again. It is
very difficult to time and cost estimate. The phases are very large, it
is therefore very difficult to estimate how much each step cost. In a
number of new methods are almost all aspects of a software development
process included. One can think of planning techniques, project
management methods and how the project should be organized. In many
software projects, different people at different stages of the project.
For example: the designers and builders. They all have a different view
of the project as designers look at the project differently than the
builders. Conversely, the builders often different from the design of
the designers look than the designers themselves. Frequently, the design
will be adjusted again. Here is the waterfall model is not made for
that. Within the project the team members often specialized. One team
member will be only the first phase involved the design, while the only
builders in construction helping to build the project. This can lead to
waste of different sources. The main source is the time. An example: the
designers are working on perfecting the design. The builders are in
principle already start building, but because they work with the
waterfall model, they should wait until the first phase is complete.
This is a typical example of wasted time. Testing is done only in one of
the last phases of the project. In many other software development
methods will be tested once a certain part and finished product is at
last an integration test. Because so much emphasis on documentation, the
waterfall model is not efficient for smaller projects. There’s too much
effort to the project itself around in terms of documentation.
2 comments:
i seen your blog yes its a very learn able artical
anyway thanks
------mohammed Shiroz-----
Hello,
The Article on Waterfall Model is amazing, gives detailed information about it. Thanks for Sharing the information about all History of Waterfall Model For More information check the detail on the Waterfall testing here Software Testing Company
Post a Comment